Improvement of the process for changing the production by using an established method. Application for S.C. COMPA S.A.
Abstract
The study presented in this work aims to optimise the performance of the Workshop 770 from the company SC COMPA SA - Sibiu, by reducing the time needed to perform the changes of fabrication. After having assisted in 5 changes of fabrication, the causes determining the slowing of the process were noted, but also the possible methods of improving in order to reduce the losses of time. The workshop’s performance is constantly calculated with the help of indicator OEE (Overall Equipment Effectiveness).
Full Text:
PDFRefbacks
- There are currently no refbacks.
Copyright (c) 2018 Journal of Electrical Engineering, Electronics, Control and Computer Science
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.